1,008 NVIDIA Vera Rubin GPUs — 14 NVL72 racks — offered as dedicated bare metal in a liquid-cooled modular datacenter in Sicily, Italy, with a June 2027 ready-for-service target. The deployment can expand to 28 racks (2,016 GPUs). Pricing is $9.70/GPU-hr on a 5-year term; terms run from 3 to 5 years with a 25–35% advance.
Power comes from an on-site power plant combined with solar and batteries. This is the first Vera Rubin capacity on the Ax3 marketplace located in Europe, for buyers who need Rubin-generation compute inside the EU, and the 14-rack starting block with room to double suits a dedicated single-tenant deployment. The public tile shows the headline specification; the complete data room — rack and fabric configuration, exact location, counterparty and full term sheet — is shared once both sides agree to connect.
Cluster size, site and counterparty details are confirmed by Ax3 before any introduction.